Congratulations on Going Solar! 🌞

you’ve made a great choice

You’ve made the leap to solar energy, and you might be wondering, “What’s next?” Don’t worry, we’re here to guide you through every step of the process.

Centauri Systems solar installation photo 9
Step 1

Give us a few documents

Centauri Systems solar installation photo 9
Step 2

Schedule your Site Visit

Centauri Systems solar installation photo
After Installation

Apply for your Incentives

First Things First

We’ll need a few documents to kick things off:

Upload a Utility Bill:

This is a required document to begin your DER Interconnection to install solar at your home

Homeowners Ins. Declarations:

This should show at least $300,000 in personal liability coverage on your insurance declarations page. This is a utility requirement for them to arrive to perform the Witness test, we submit this as a part of interconnection

These documents are crucial for initiating the Distributed Energy Resource (DER) Interconnection, a mandatory utility procedure. This process formally notifies your utility provider of your intent to install a solar system at your residence.

Max. file size: 300 MB.
Max. file size: 300 MB.
Name(Required)

Next Steps

Once we have your documents, we’ll move on to:

Schedule a Site Visit:

A crucial step in tailoring your solar system to your home’s specific needs.

Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8

1. Consultation

When creating a personalized solar proposal, we first evaluate your energy needs and investment preferences.

2. Financing & Incentives

When creating a personalized solar proposal, we first evaluate your energy needs and investment preferences.

3. Site Visit

A quick site visit is important so that our team can combat any potential risks on installation day.

4. INTERCONNECTION

When it comes to connecting your solar system to the electrical grid, there’s a crucial step

5. Planning & Permitting

As we plan out the building of your project, obtaining permits is a critical step.

6. Construction

The construction phase of your solar project is a short process, typically lasting just a few days.

7. Inspection

After your solar system is installed, inspections usually happen within about a week.

8. Permission to Operate

After your solar system is installed, inspections usually happen within about a week.

Curious about what lies ahead?

what to expect – start to finish

We’re your trusty sidekick on this solar adventure! With our seasoned expertise, we’ll masterfully plan, install, connect your system to the grid, and make sure it gets the thumbs-up for operation. Along the way, consider us your solar superhero squad, ready to swoop in with answers and guidance!

Relax, We’ve Got This

Welcome to the Centuari Family

Your journey to sustainable energy starts now.

Need Assistance?

Whether you have questions about incentives, financing options, or if you encounter any issues, our team is here to help