
New roof under your solar? One company for both.
We take your panels down, replace the roof and put your system back up, then confirm it’s producing before we leave. One project manager, one schedule, and we pay you for the solar you miss while it’s down.


Two contractors, one roof, and nobody owns the leak.
When a roofer and a solar company split the job, every problem becomes the other one’s fault. We do both, so the roof and the system come back as one job with one warranty conversation.
One person to call
A single project manager runs the detach, the roof and the reset.
Old holes sealed properly
Every old mount hole is decked over, sealed and shingled as if the array had never been there.
Proof it’s producing
We check that every part of the system is reporting before we leave, and compare it to your production before the work.
Down, roofed and back up.



The system comes down.
We shut the system down at the inverter and disconnect. Panels, racking and mounting hardware come off and are stored on site, labeled by position so everything goes back where it was.
Your panels come down. Your savings don’t.
While your system is off the roof, we pay you for the solar it would have produced, based on a year of your production data. It applies to every removal and reinstall we do, even if someone else installed your system.
From signature to powered back up.
Most projects wrap up in under three weeks. Scroll through what we take care of, and the few things we’ll need from you.
Countersign your agreement, open your project file and assign your project manager, who sends you their direct line.
Sign and submit your deposit.
Review your array’s mounting, inverters and any hardware that needs replacing. Pull the roofing and electrical permits and order material.
Pick your shingle color and send a recent production screenshot or your monitoring login, so we can confirm the same output afterward.
Line up your install around the roofing schedule and material delivery, and call to confirm it.
Clear the driveway.
Take the system down, replace the roof and reinstall the system, as shown above.
Keep pets inside and cars off the driveway. Your system is off while the roof is replaced, and we pay you for the production you miss.
Ten-point cleanup and a magnetic nail sweep. Your project manager walks the property with you and pulls up your monitoring app to show the system back online.
Walk it with us, then watch your app over the next few sunny days.
Meet the city roofing inspection and any electrical inspection, register your CertainTeed warranty and send your closeout packet with photos and warranty documents.
Keep the packet. It’s what lets your warranty transfer to a future owner.
An honest note on timing. Most projects are done in under three weeks, but timing depends on the roofing schedule, materials and weather. We won’t leave an array off in front of a storm. If something slides, you’ll hear it from your project manager first.
Common removal and reinstall questions.
How long will my solar be off?
It depends on the roofing schedule and materials, so we don’t promise a set number of days. Either way, we pay you for the solar production you miss while the system is down.
How do you figure out what I missed?
We use a year of your system’s production data to estimate what it would have made while it was off, and pay you for it. Share your monitoring access or production history at the start of the project.
Does my system have to be a Centauri install?
No. We remove and reinstall systems no matter who installed them, and the missed-production payment applies to every removal and reinstall we do.
How long does the whole project take?
Most projects are done in under three weeks from signing to your system producing again. The roofing schedule, materials and the forecast set most of that timeline.
Will my panels go back in the same spots?
Yes. Everything is labeled by position when it comes off, and new flashed mounts are set into the new roof so the system goes back the way it was.
How do I know my system is working afterward?
We confirm every part of the system is reporting before we leave, and compare it to the production screenshot or monitoring access you share at the start. Your project manager walks you through it in your app.
What roofing do you use?
CertainTeed roofing systems, and we register your CertainTeed warranty as part of closeout.
